ODHIN Technical Reports and Deliverables

Documents

Order by : Name | Date | Hits | [ Ascendant ]

WP5 - Deliverable 5.1: RCT Protocol WP5 - Deliverable 5.1: RCT Protocol

hot!
Date added: 09/03/2012
Date modified: 04/06/2016
Filesize: 1.07 MB
Downloads: 3394

Original Protocol for the WP5 randomised controlled trial (RCT), as submitted to the European Commission in June 2012.

(related text: Deliverable 5.2 Results of the WP5 RCT, including updated methods. Available soon)

ODHIN First Periodic Report ODHIN First Periodic Report

hot!
Date added: 03/22/2013
Date modified: 12/15/2016
Filesize: 4.98 MB
Downloads: 3321

The first periodic technical report for ODHIN details the scientific project work undertaken in all work packages between 1st January 2011 and 30th June 2012, as well as progress towards milestones and deliverables, as laid out in the description of work.

Deliverable 2.1 - Literature review of SBI for lifestyle issues Deliverable 2.1 - Literature review of SBI for lifestyle issues

hot!
Date added: 01/20/2014
Date modified: 06/13/2016
Filesize: 1.33 MB
Downloads: 3112

A literature review to provide the knowledge base of successful implementation of screening and brief intervention for lifestyle issues in every day routine primary health care practice.

ODHIN Second Periodic Report ODHIN Second Periodic Report

hot!
Date added: 05/09/2014
Date modified: 12/15/2016
Filesize: 3.68 MB
Downloads: 3075

ODHIN Second periodic technical report as submitted to the European Commission.

This report details the scientific project work undertaken in all work packages between 1st January 2011 and 31st December 2013.

WP2: MS1 - Protocol WP2: MS1 - Protocol

hot!
Date added: 09/03/2012
Date modified: 06/05/2014
Filesize: 558.78 kB
Downloads: 3011

Core group workshop on the search strategy for the series of scientific papers review. WP2 Protocol.