ODHIN Technical Reports and Deliverables

Documents

Order by : Name | Date | Hits | [ Descendent ]

WP2: MS1 - Protocol WP2: MS1 - Protocol

hot!
Date added: 09/03/2012
Date modified: 06/05/2014
Filesize: 558.78 kB
Downloads: 4577

Core group workshop on the search strategy for the series of scientific papers review. WP2 Protocol.

ODHIN Second Periodic Report ODHIN Second Periodic Report

hot!
Date added: 05/09/2014
Date modified: 12/15/2016
Filesize: 3.68 MB
Downloads: 5167

ODHIN Second periodic technical report as submitted to the European Commission.

This report details the scientific project work undertaken in all work packages between 1st January 2011 and 31st December 2013.

Deliverable 2.1 - Literature review of SBI for lifestyle issues Deliverable 2.1 - Literature review of SBI for lifestyle issues

hot!
Date added: 01/20/2014
Date modified: 06/13/2016
Filesize: 1.33 MB
Downloads: 5259

A literature review to provide the knowledge base of successful implementation of screening and brief intervention for lifestyle issues in every day routine primary health care practice.

Deliverable 5.3 Implementation guide Deliverable 5.3 Implementation guide

hot!
Date added: 12/29/2014
Date modified: 06/14/2016
Filesize: 234.57 kB
Downloads: 5456

Improving the delivery of brief advice for heavy drinking in primary health care - summary and implementation guide for policy makers.

This report summarises the results of the randomised controlled trial performed in WP5 of the ODHIN project, which aimed to test different strategies for increasing the level of screening and delivering advice for heavy drinking in primary health care settings. Based on the findings, recommendations for policy makers and service commissioners for the future roll out of these strategies are presented.

ODHIN First Periodic Report ODHIN First Periodic Report

hot!
Date added: 03/22/2013
Date modified: 12/15/2016
Filesize: 4.98 MB
Downloads: 5528

The first periodic technical report for ODHIN details the scientific project work undertaken in all work packages between 1st January 2011 and 30th June 2012, as well as progress towards milestones and deliverables, as laid out in the description of work.