Error
  • The template for this display is not available. Please contact a Site administrator.

ODHIN Technical Reports and Deliverables

Documents

Order by : Name | Date | Hits [ Ascendant ]

WP5 - Deliverable 5.1: RCT Protocol WP5 - Deliverable 5.1: RCT Protocol

hot!
Date added: 09/03/2012
Date modified: 04/06/2016
Filesize: 1.07 MB
Downloads: 6117

Original Protocol for the WP5 randomised controlled trial (RCT), as submitted to the European Commission in June 2012.

(related text: Deliverable 5.2 Results of the WP5 RCT, including updated methods. Available soon)

WP2: MS1 - Protocol Amendment WP2: MS1 - Protocol Amendment

hot!
Date added: 09/03/2012
Date modified: 06/05/2014
Filesize: 68.06 kB
Downloads: 6507

Core group workshop on the search strategy for the series of scientific papers review. WP2 Protocol Amendment.

WP2: MS1 - Protocol WP2: MS1 - Protocol

hot!
Date added: 09/03/2012
Date modified: 06/05/2014
Filesize: 558.78 kB
Downloads: 5017

Core group workshop on the search strategy for the series of scientific papers review. WP2 Protocol.

ODHIN Third Periodic Report ODHIN Third Periodic Report

hot!
Date added: 06/09/2016
Date modified: 12/15/2016
Filesize: 2.92 MB
Downloads: 6951

ODHIN Third periodic technical report as submitted to the European Commission.

This report details the scientific project work undertaken in all work packages between 1st January 2014 and the formal end of the project, 31st December 2014.

ODHIN Second Periodic Report ODHIN Second Periodic Report

hot!
Date added: 05/09/2014
Date modified: 12/15/2016
Filesize: 3.68 MB
Downloads: 5714

ODHIN Second periodic technical report as submitted to the European Commission.

This report details the scientific project work undertaken in all work packages between 1st January 2011 and 31st December 2013.