ODHIN Technical Reports and Deliverables
Documents
WP5 - Deliverable 5.1: RCT Protocol
Date added: | 09/03/2012 |
Date modified: | 04/06/2016 |
Filesize: | 1.07 MB |
Downloads: | 6155 |
Original Protocol for the WP5 randomised controlled trial (RCT), as submitted to the European Commission in June 2012.
(related text: Deliverable 5.2 Results of the WP5 RCT, including updated methods. Available soon)
WP2: MS1 - Protocol
Date added: | 09/03/2012 |
Date modified: | 06/05/2014 |
Filesize: | 558.78 kB |
Downloads: | 5047 |
Core group workshop on the search strategy for the series of scientific papers review. WP2 Protocol.
WP2: MS1 - Protocol Amendment
Date added: | 09/03/2012 |
Date modified: | 06/05/2014 |
Filesize: | 68.06 kB |
Downloads: | 6544 |
Core group workshop on the search strategy for the series of scientific papers review. WP2 Protocol Amendment.
ODHIN First Periodic Report
Date added: | 03/22/2013 |
Date modified: | 12/15/2016 |
Filesize: | 4.98 MB |
Downloads: | 6114 |
The first periodic technical report for ODHIN details the scientific project work undertaken in all work packages between 1st January 2011 and 30th June 2012, as well as progress towards milestones and deliverables, as laid out in the description of work.
Deliverable 3.1 - Cost-Effectiveness Model Report
Date added: | 01/20/2014 |
Date modified: | 02/21/2014 |
Filesize: | 663 kB |
Downloads: | 20753 |